Motorways Without the Gateway: Sindh’s Missing Links in Pakistan’s Transport Network

Ishak Soomro Ishak Soomro

Motorways Without the Gateway: Sindh’s Missing Links in Pakistan’s Transport Network



Pakistan’s motorway network has expanded rapidly over the past two decades, yet a closer look at the national transport map reveals a striking imbalance. Despite being home to the country’s primary maritime gateways, Sindh remains one of the least connected provinces in terms of motorway infrastructure. The slow progress of key projects raises questions about national planning priorities and their implications for trade, logistics, and regional equity.

According to plans prepared by the National Highway Authority (NHA), several motorways were intended to pass through Sindh, forming an important part of Pakistan’s national transport network. However, only a small portion of these routes has been completed. The M-5 Motorway is currently the only fully operational motorway segment touching Sindh. Its Sindh section, stretching from Kashmore to Sukkur and measuring about 126 kilometers, has been completed and is functioning.

Other key projects remain stalled or incomplete. The proposed M-6 Motorway, a 306-kilometer route intended to connect upper and lower Sindh, has yet to begin construction. Similarly, the Sindh portion of the M-7 Motorway, roughly 100 kilometers long, remains on paper. The Sindh section of the M-8 Motorway around 64 kilometers has also not been upgraded to full motorway standards. Meanwhile, the M-9 Motorway, though operational, has yet to fully meet the design standards typically associated with modern motorways.

Another route, the M-10 Motorway, extending about 57 kilometers, is also not considered a fully developed motorway corridor. In addition, a proposed 168-kilometer motorway linking Hyderabad to Karachi through the region near Kirthar National Park remains at the proposal stage. In total, nearly 957 kilometers of motorways have been planned within Sindh. Of these, only about 126 kilometers have been completed, leaving approximately 831 kilometers still pending. This means that the vast majority of Sindh’s planned motorway network has yet to materialize.

The lack of motorway infrastructure in Sindh is particularly striking given the province’s central role in national trade. Sindh hosts Pakistan’s major seaports, including Port of Karachi and Port Qasim, while Gwadar Port also connects to inland markets through routes passing near the province. These ports handle the majority of Pakistan’s imports and exports. Goods arriving by sea must be transported to industrial and commercial centers across provinces such as Punjab and Khyber Pakhtunkhwa. From a logistics perspective, high-speed motorways should ideally originate near these ports and extend inland, enabling efficient cargo movement to the rest of the country. Because the motorway network in Sindh remains incomplete, most freight traffic continues to rely on conventional highways. Heavy trucks and trailers often move slowly through congested roads and aging infrastructure. Transporters report that journeys of around 700 kilometers within Sindh can take two to three days under current conditions. On a modern motorway, the same distance could be covered in roughly ten hours.

These delays increase fuel consumption, raise transportation costs, and create inefficiencies in the national supply chain. Ultimately, the burden is felt across the economy through higher logistics costs and slower delivery times. The broader national picture highlights this imbalance. Pakistan’s planned motorway network is estimated at around 4,000 kilometers. Approximately 2,300 kilometers have already been built, most of them concentrated in Punjab and Khyber Pakhtunkhwa.

By contrast, about 831 kilometers of planned motorways in Sindh remain unbuilt, while nearly 870 kilometers are still pending in Balochistan.This distribution raises concerns about whether motorway development has followed a balanced national strategy or whether certain regions have consistently received greater priority. From an economic standpoint, infrastructure planning should align with trade flows and national logistics needs. Motorways beginning at seaports and extending toward inland markets would allow imports and exports to move quickly and efficiently. However, current development patterns appear to have progressed in the opposite direction, with interior regions receiving earlier investment while the coastal gateway—through which most trade passes—remains relatively underdeveloped. When motorway projects in Sindh are discussed, delays are frequently attributed to funding shortages, even as large-scale projects continue elsewhere. Transport infrastructure is not merely a provincial concern; it is a matter of national economic efficiency. Strengthening motorway connectivity in Sindh would not only benefit the province but also enhance the overall performance of Pakistan’s trade and logistics system. 

A stronger network linking the country’s ports to its industrial and agricultural heartlands could reduce transportation costs, shorten delivery times, and improve supply chain reliability. For a country whose economic lifeline runs through its seaports, ensuring that the gateway itself is properly connected should be a national priority.

Professional Profile: Ishak Soomro

Ishak Soomro is a highly experienced professional specializing as a Journalist, Research Associate, and Columnist with a distinguished career spanning 15 years

​He possesses extensive expertise in multilingual communication and analysis, having written and contributed across three major languages: Sindhi, Urdu, and English

ishaksoomro@yahoo.com